VERBUND’s LIFE projects
For 25 years, VERBUND has been reshaping the landscape along Austria’s major waterways. The motto is: ‘Big is beautiful.’ Modern electronics help to optimise planning and analyse the success of new fish migration aids.
Life is Life in the former quarry: where, just five years ago, heavy machinery completely transformed the rivers Krems, Kamp and the Danube oxbow lake near Altenwörth over a stretch of more than twelve kilometres, today there is an impressive natural paradise that is unrivalled in its form. It is one of the more recent EU-funded LIFE projects through which Austria’s largest electricity generator, VERBUND, is making its hydroelectric power stations passable for fish. Whilst the term ‘fish migration aid’ may officially be the correct one in Altenwörth, the life unfolding here is far more multifaceted – as colourful as one would never find on a ‘normal’ Danube bank. It is a river landscape of meanders, gravel banks and islands, set against a backdrop of willow thickets and reed beds. A refuge which, incidentally, may also be used by people.
Yet one would never guess from the idyllic scene that it is confined to a narrow strip which follows first the power station’s backwater and then the former Danube oxbow lake all the way to the power station’s outlet, overcoming a 16-metre difference in height in the process. Consequently, the waters brought together here by the Krems, Kamp and Danube flow at a brisk pace. At a bend in the river, the air is full of sand martins, flying in and out of their nesting sites in a clayey, steep riverbank face several hundred metres long. In many places along the banks, grey herons wade through the water. Reeds, willows and flowering meadows at the edge of the floodplain forest give no hint that, only very recently, 580,000 cubic metres of gravel and sediment were dredged away with the utmost precision and re-deposited according to exact GPS coordinates and a precise plan.